Editors' Call ARTICLES Regenerative Stream Restoration Water Providers Assist in Renewing Program for Endangered Fish Kerber Creek Restoration Project Water Quality Modeling in the Barr Lake and Milton Reservoir Watershed RiverBank: Water Trusts in the Western United States Summary of Sustaining Colorado Watershed Conference FEATURES Message from the President Research Summaries BACK ISSUES Volume 20 Number 2 Fall 2009 Volume 20 Number 1 Spring 2009 Volume 19 Number 3 Winter 2009 Volume 19, Number 2 Summer 2008 Volume 19, Number 1 Spring 2008 Volume 18, Number 3 Winter 2007/2008 Volume 18, Number 2 Summer/Fall 2007 Volume 18, Number 1 Spring 2007 Index of Back Issues |
Kerber Creek Restoration Projectby Matthew Skarie
In the 1880s silver ore was discovered in the area. By 1900, more than 1500 prospect hole and mines had opened, the largest being the Rawley Mine. Over the years approximately 476,000 tons of ore were produced from the Rawley mine alone. Mining continued sporadically in the area for the next 80 years with another major boom in the 1920s. Several dams were constructed in order to accommodate the tailings created by the volume of ore being mined. In the 1960s-70s mine waste was washed downstream after dam failures, leaving over 200 acres of mine waste along the stream. The waste left behind from the decades of mining has impacted both the creek and floodplains surrounding Kerber Creek. In 1994, the American Smelting and Refining Company (ASARCO, Inc.) initiated cleanup of the main stem of Kerber Creek. By 1998 they had completed their riparian restoration and constructed a plug in the Rawley 12 adit in order to eliminate the discharge. Also during this time the Colorado Department of Public Health and Environment (CDPHE) removed three waste piles located within the watershed. Although these cleanups did improve the water and soil quality in the upper watershed, they still left 17 miles of contamination in the lower watershed and impaired stream channel in the entire drainage. In 2005 a multi-partnered initiative, including the Bureau of Land Management (BLM), Trout Unlimited (TU), the Natural Resources Conservation Service (NRCS) and the stakeholders who formed the Bonanza Stakeholders Group (BSG) began a revitalization effort focusing on the lower part of the Kerber Creek watershed. These groups along with other partners have worked together to restore, maintain, and monitor the watershed. This effort looked at several environmental impacts left from the tailings. The goals of this effort were to reduce metal mobility in soils, increase sinuosity, reduce the channel width, improve depth, increase the density of aquatic life, increase vegetation cover and stabilize the stream banks.
Natural processes will occur to improve stream sinuosity as stream channel stabilization projects are implemented. Rock structures, sedge mats and willow plants are being used to close in the riparian vegetation and narrow the creek. This will improve floodplain recharge, reduce channel width and increase the depth. As this occurs the stream banks will stabilize and eventually be able to facilitate sustainable fate and transport of sediment. Another project goal is to increase the density of aquatic life in Kerber Creek. In the 1980s sampling showed that there were no fish in the creek. Further sampling in 2008 and 2009 showed that brook trout and long nose dace are now self-sustaining in Kerber Creek. While the quality of water in Kerber Creek improves aquatic life will naturally migrate from tributaries into the stream. Continued monitoring will occur to document macro-invertebrate and fishery densities. The end goal is to closely match the nearest similar natural stream community.
Since 2007 60 acres of mine waste along the creek have been phytostabilized, 40 of those acres in the last year. Partners have contributed over $1.2 million in aid for clean-up. Also, these partners have contributed over 3,000 volunteer hours towards the project. Looking ahead we will continue to restore and monitor progress along the lower part of the watershed. Also, the project will expand to include the upper watershed. The areas of the upper watershed will be assessed to see which environmental issues are affecting this area. A watershed plan is being developed by partners and stakeholders. Quarterly meetings are held to discuss project status and watershed plan elements. | |||||||||||
| Posted on January 20, 2010. |